Claims Resolution

Clear Analysis/Successful Resolution

Through years of providing best practices for project management and construction scheduling , Encore has the expertise to quickly identify and analyze cost and delay issues so that disputes get resolved as quickly as possible.

Scheduling

Comprehensive Documentation, Minimized Risk

Encore’s CPM scheduling and project controls consultants are experienced in developing, analyzing, updating and monitoring project schedules and other project reporting procedures.

Scheduling

Comprehensive Planning, Effective Execution

Encore’s CPM scheduling and project controls consultants are experienced in developing, analyzing, updating and monitoring project schedules and other project reporting procedures.

Technology

Strategic Implementations

Encore’s Technology group is experienced in implementation and hosting of your project management software needs. From establishing processes to customized training programs, Encore Group’s experience enhances the success of every rollout.

HIGH-RISE CONSTRUCTION
181 Fremont. On behalf of the contractor, Encore Group prepared the construction schedules, weekly and monthly updates, and time impact analyses.
CCRPM
Clark County Real Property Management. On behalf of CCRPM Encore Group prepared a constructivity review, and is reviewing the design-build contractors construction schedule.
Resorts World. On behalf of the contractor, Encore Group prepared the construction schedules, weekly and monthly updates, and time impact analyses.
TRANSPORTATION
CA High-Speed Rail
California High-Speed Rail Phase 1. On behalf of the contractor, Encore Group prepared the proposal schedule for the contractor joint venture, which secured the project. The project value is approximately $1 billion.
US290 Corridor Widening
US290 Corridor Widening Segment 4. On behalf of the contractor, Encore Group prepared the construction schedules, weekly and monthly updates, and time impact analyses.
US290 Corridor
US290 Corridor Widening Segment 5. On behalf of the contractor, Encore Group prepared the construction schedules, weekly and monthly updates, and time impact analyses.
Ohio River Crossing />
Ohio River Crossing. On behalf of the contractor, Encore Group prepared the proposal schedule for the contractor joint venture. The project value is approximately $1 billion.
El Paso Loop 375
El Paso Loop 375 On behalf of the contractor, Encore Group prepared the proposal schedule for the contractor joint venture.
I-10 San Antonio
I-10 Corridor San Antonio. On behalf of the contractor, Encore Group prepared the construction schedules, weekly and monthly updates, and time impact analyses for the Webber project.
Angelina Projects
Angelina Projects. On behalf of the contractor, Encore Group prepared a resource analyses and balancing study for the Webber project.
Gooseberry 7 Mile
Gooseberry Seven-Mile Road Project. On behalf of the contractor, in a dispute with the Federal Highway Administration (FHWA), Encore Group prepared and presented a full delay report detailing delay events including unforeseen site conditions, bridge delays, and other delays. He used the Adjusted As-Built Analysis method to justify time extensions and extended general conditions. The dispute was successfully settled in mediation.
ENERGY
US DOE
US Department of Energy. On behalf of USDOE, Encore Group has prepared CPM Schedules and prepared delay analysis several multi-billion dollar energy programs, including the Next Generation Nuclear Facility Program.
AIRPORTS
McCarran International
McCarran International Airport. On behalf of the contractors, Encore Group has prepared CPM Schedules and prepared delay analysis on over 25 projects, including runways, taxiways, apron expansions, new terminals, terminal remodels, baggage handling systems, ticket and baggage handling expansions.
Meadows Field Terminal
Meadows Field Terminal. On behalf of the contractor in a dispute with the Airport owner, Encore Group prepared and presented on a full delay report detailing delay events including design and other conflict delays. He used the Contemporaneous Time-Frame Analysis method to justify damages caused by delay and extended general conditions. The dispute was successfully resolved by Mediation.
HOTELS AND CASINOS
The Quad
The Quad. On behalf of the contractor, Encore Group prepared a CPM baseline schedule and established the updating process for this 1100 room casino and high-rise hotel renovation.
Resorts World. On behalf of the contractor, Encore Group prepared the construction schedules, weekly and monthly updates, and time impact analyses.
SPORTS ARENAS AND STADIUMS
le Miss Sports Arena
Ole Miss Sports Arena. On behalf of the construction manager, Encore Group prepared a CPM baseline schedule as a constructability review for a new state of the art arena.
COMMERCIAL & RESIDENTIAL
The Village at Ocotillo
The Village at Ocotillo. On behalf of the contractor in a dispute with the Framing Subcontractor, Encore Group prepared and was deposed on a full delay report detailing delay events including production delays and other delays. He used the Adjusted As-Built and Adjusted As-planned Analysis method to justify damages caused by delay and extended general conditions. The dispute was successfully resolved by Negotiation.
The Argo Town Lake apartments. On behalf of the contractor, Encore Group prepared the construction schedules, weekly and monthly updates, and time impact analyses.
Elevation On Central
Elevation On Central. On behalf of the contractor, Encore Group prepared the construction schedules, weekly and monthly updates, and time impact analyses.
The Met
The Met. On behalf of the contractor, Encore Group prepared the construction schedules, weekly and monthly updates, and time impact analyses.
The Trillium
The Trillium. On behalf of the contractor, Encore Group prepared the construction schedules, weekly and monthly updates, and time impact analyses.
Platinum Vista
Platinum Vista. On behalf of the contractor, Encore Group prepared the construction schedules, weekly and monthly updates, and time impact analyses.
Platinum Gateway
Platinum Gateway. On behalf of the contractor, Encore Group prepared the construction schedules, weekly and monthly updates, and time impact analyses.

Construction Scheduling with Primavera P6 2-Part Training

 

P6 EPPM Client missing OCI DLL

Failed login? Missing OCI DLL solution

If your Primavera P6 Professional client (v15-16) cannot connect to an EPPM database and gives you a Missing OCI DLL error, here is the solution.more
Read More ...

Latest Webinar: Managing Schedule Specifications to Avoid Claims

Latest Webinar: Managing Schedule Specifications to Avoid Claims

This seminar covers a common set of issues encountered in Progress Schedule Specifications. Most Owner prepared schedule specifications abdicate the responsibility of preparing and managing the project schedule to the contractor.....more
Read More ...

Solving Primavera Excel Import/Export Problems

P6 Excel Import/Exports failing?

Are you getting an error message when you try to Import or Export to Excel from Primavera P6 15.2?more
Read More ...

Is your Primavera P6 local database full?

Is your Primavera P6 local database full?

If your Primavera P6 Professional standalone local database (Oracle XE or SQL Express) has reached it's 4 or 10GB size limitation, here is a document you'll need to familiarize yourself with.more
Read More ...